Spot On Performance
  • Products
    • SOP Materials
    • SOP Construction
    • SOP Carrier/Dispatch
    • SOP Driver
  • Industries
    • Frac Sand
    • Asphalt
    • Aggregates
    • Concrete
    • Oil & Gas
  • Resources
    • Training
    • Apps
    • E-Ticketing
    • Blog
  • Company
    • About Us
  • Login
  • Products
    • SOP Materials
    • SOP Construction
    • SOP Carrier/Dispatch
    • SOP Driver
  • Industries
    • Frac Sand
    • Asphalt
    • Aggregates
    • Concrete
    • Oil & Gas
  • Resources
    • Training
    • Apps
    • E-Ticketing
    • Blog
  • Company
    • About Us
  • Login
  • Products
    • SOP Materials
    • SOP Construction
    • SOP Carrier/Dispatch
    • SOP Driver
  • Industries
    • Frac Sand
    • Asphalt
    • Aggregates
    • Concrete
    • Oil & Gas
  • Resources
    • Training
    • Apps
    • E-Ticketing
    • Blog
  • Company
    • About Us
  • Login
  • Products
    • SOP Materials
    • SOP Construction
    • SOP Carrier/Dispatch
    • SOP Driver
  • Industries
    • Frac Sand
    • Asphalt
    • Aggregates
    • Concrete
    • Oil & Gas
  • Resources
    • Training
    • Apps
    • E-Ticketing
    • Blog
  • Company
    • About Us
  • Login

Getting Started

7
  • Notifications
  • Setting a Default Plant
  • Mobile Apps
  • Job Search
  • Navigating Work Shifts
  • SOP’s Dashboard
  • Accessing SOP

Administrators

11
  • Plant Setup
  • System Settings
  • Truck Management
  • Customers
  • Carrier Management
  • Driver Management
  • Project Owners
  • Inviting New Accounts
  • Inspection Firms
  • GPS Truck Tracking
  • GPS Setup

Managers

16
  • GPS Setup
  • GPS Truck Tracking
  • Load QC Reporting
  • Backhaul Scheduling
  • Job Setup and Details
  • Job Shift Settings
  • Job Access
  • Production Scheduling
  • Truck Dispatch
  • User Management
  • User Roles
  • Activity Report
  • Performance & Dwell Report
  • Time Report
  • Quality Control Report
  • System Reports

E-Ticketing

3
  • Notes and Pictures
  • Quality Control
  • E-Ticket Reporting

Plant Management

2
  • Dashboard
  • Plant Dashboard

Delivery Management

6
  • GPS Setup
  • GPS Truck Tracking
  • Location and Targets
  • Interactive Unloading
  • Truck Time Cards
  • Load Uses

Material Hauling

3
  • Material Haul Scheduling
  • Loading
  • Interactive Unloading

Drivers

9
  • Job Access
  • Time Cards
  • E-Tickets
  • Interactions
  • Check-In
  • Driver App Install
  • GPS Truck Tracking
  • GPS Setup
  • Driver Coins

Order Management

3
  • Orders
  • Creating an Order
  • Viewing & Editing Orders

E-Tickets & Reports

2
  • Ticket Search
  • Job Ticket Search
View Categories
  • Home
  • Training
  • Managers
  • Time Report

Time Report

Watch Video Guide

Overview

SOP automates the creation of truck time cards based on the load and unload times of each truck.

During a shift, users can access the time report by clicking on the Time Report button at the bottom of the Returning Loads list or using the Reports button on the Summary view. Once a shift is closed, Project Managers can find the Time Report under the Reports tab.


Time Report

TThe Time Report provides a detailed record for each truck, including sign-in and sign-out times, first load time, start time, total time, loads, and tons.


Summary

At the bottom of the Time Report, users will find a summary section that includes totals and averages. Users can also download the Time Report as a CSV file to view in Excel or other spreadsheet software.


Adjustments

If a driver’s time needs to be adjusted due to delays or additional work, managers can add adjustments to their time reports.

To add an adjustment, select the corresponding time report record and click Edit to access the details panel. Use the “Add Minutes” button to increase the adjustment time or use the “Toggle -” button to subtract time. Then, select a reason for the adjustment and add a note before saving the changes.

The adjustment will be listed in the adjustments section, and the sign-out time will be updated accordingly.


Approval

To close a time card and mark it as approved, use the blue “Sign Out” button. Once approved, the “Review” button will turn blue, indicating that the entry has been approved. The system also keeps track of the user who approved the entry.

Please note that using the Sign Out button on the Last Unloaded and Returning trucks view will automatically approve the corresponding time card.

Updated on June 7, 2023

What are your Feelings

  • Happy
  • Normal
  • Sad

Share This Article :

  • Facebook
  • X
  • LinkedIn
  • Pinterest
Performance & Dwell ReportQuality Control Report
Table of Contents
  • Overview
  • Time Report
  • Summary
  • Adjustments
  • Approval

Subscribe to our Newsletter

Get notified of news and updates first.

    Porto App Landing © Copyright 2023. All Rights Reserved.