Spot On Performance
  • Products
    • SOP Materials
    • SOP Construction
    • SOP Carrier/Dispatch
    • SOP Driver
  • Industries
    • Frac Sand
    • Asphalt
    • Aggregates
    • Concrete
    • Oil & Gas
  • Resources
    • Training
    • Apps
    • E-Ticketing
    • Blog
  • Company
    • About Us
  • Login
  • Products
    • SOP Materials
    • SOP Construction
    • SOP Carrier/Dispatch
    • SOP Driver
  • Industries
    • Frac Sand
    • Asphalt
    • Aggregates
    • Concrete
    • Oil & Gas
  • Resources
    • Training
    • Apps
    • E-Ticketing
    • Blog
  • Company
    • About Us
  • Login
  • Products
    • SOP Materials
    • SOP Construction
    • SOP Carrier/Dispatch
    • SOP Driver
  • Industries
    • Frac Sand
    • Asphalt
    • Aggregates
    • Concrete
    • Oil & Gas
  • Resources
    • Training
    • Apps
    • E-Ticketing
    • Blog
  • Company
    • About Us
  • Login
  • Products
    • SOP Materials
    • SOP Construction
    • SOP Carrier/Dispatch
    • SOP Driver
  • Industries
    • Frac Sand
    • Asphalt
    • Aggregates
    • Concrete
    • Oil & Gas
  • Resources
    • Training
    • Apps
    • E-Ticketing
    • Blog
  • Company
    • About Us
  • Login

Getting Started

7
  • Notifications
  • Setting a Default Plant
  • Mobile Apps
  • Job Search
  • Navigating Work Shifts
  • SOP’s Dashboard
  • Accessing SOP

Administrators

11
  • Plant Setup
  • System Settings
  • Truck Management
  • Customers
  • Carrier Management
  • Driver Management
  • Project Owners
  • Inviting New Accounts
  • Inspection Firms
  • GPS Truck Tracking
  • GPS Setup

Managers

16
  • GPS Setup
  • GPS Truck Tracking
  • Load QC Reporting
  • Backhaul Scheduling
  • Job Setup and Details
  • Job Shift Settings
  • Job Access
  • Production Scheduling
  • Truck Dispatch
  • User Management
  • User Roles
  • Activity Report
  • Performance & Dwell Report
  • Time Report
  • Quality Control Report
  • System Reports

E-Ticketing

3
  • Notes and Pictures
  • Quality Control
  • E-Ticket Reporting

Plant Management

2
  • Dashboard
  • Plant Dashboard

Delivery Management

6
  • GPS Setup
  • GPS Truck Tracking
  • Location and Targets
  • Interactive Unloading
  • Truck Time Cards
  • Load Uses

Material Hauling

3
  • Material Haul Scheduling
  • Loading
  • Interactive Unloading

Drivers

9
  • Job Access
  • Time Cards
  • E-Tickets
  • Interactions
  • Check-In
  • Driver App Install
  • GPS Truck Tracking
  • GPS Setup
  • Driver Coins

Order Management

3
  • Orders
  • Creating an Order
  • Viewing & Editing Orders

E-Tickets & Reports

2
  • Ticket Search
  • Job Ticket Search
View Categories
  • Home
  • Training
  • Managers
  • Production Scheduling

Production Scheduling

Watch Video Guide

Overview

SOP provides managers with the capability to schedule upcoming job shifts, allowing for effective communication of job targets and start schedules with plant operators. Additionally, users can schedule trucks to establish time report starts and share schedule PDFs with brokers and drivers.

Scheduled jobs will be visible on the dashboard for managers and foremen, while plant users can view their scheduled jobs on the plant dashboard.

It is important to note that if a job is scheduled against an external producer, it will be marked as ‘PENDING’ and await schedule confirmation from the producer.


Schedule a Job

To create a new scheduled job, navigate to the dashboard and click on ‘Schedule a Job’ located at the top of the Upcoming Jobs list. Follow the steps outlined below to create a new scheduled job.


Job Details

In the Job Details panel, select the Job Type and Job Number. Begin typing the job number in the Job Number field and select the desired job from the list to validate your selection.


More Details

Managers can select a Cost Code and enter a Mix Type to a Scheduled Job. These details will appear on the Scheduled Jobs list and the Schedule PDF. Please note that cost codes and mix types are not used for matching job shifts from the scale system. Additionally, a shift note can be added for reference in the Job Shift Summary view. Note: A Job Number is required when scheduling any job.

If paving in echelon or if multiple pavers are working on the same job, you can utilize the ‘Advanced Options’ by clicking on it to add a Destination. This feature can be used to match the paver or foreman field from the scale system. To enable the Destination feature, please contact [email protected] and confirm its availability for your SOP account.


Job Schedule

The Job Schedule panel allows managers to enter the start date and start time for the job. By default, the date and time will be set to the next day at 7:30 am. Jobs can be scheduled multiple days in advance.

Managers can set the target tons and target hours to establish progress and time goals for the day. These values will be used for the loaded and paved progress bars and report. The Tons Per Hour (TPH) will be automatically calculated and used to compare the current Unload TPH progress in real-time during the shift. The Target TPH will also be displayed on the TPH chart in the activity report, to review Load and Unload TPH performance throughout the day.

Additionally, managers can add a schedule note for the truck scheduler to view on the Truck Schedule page.

Load Location

A plant is required for the load location of production job types. To select a Plant, click on ‘Select Plant’ in the Plant field and choose the appropriate plant. Contractors linked to one or more producers will see the name of the producer before the plant name. Note: Load Locations are required for any job being scheduled.

Deliver Location

When selecting the deliver location, most users will choose ‘Address and Map GPS’. If scheduling from a deliver location in the field, select ‘Field GPS’ and click the ‘Use My Location’ button.

For ‘Address and Map GPS’, enter at least two address fields and click ‘Show Map’ to search for the location. Once the map appears, zoom in or out and drag the map image to find the precise deliver location. Click on the map to set the location icon to the exact deliver location.


Target

In the Target panel, managers can set the target tons and target hours for the shift. The system will automatically calculate the estimated ‘Tons Per Hour’ based on the submitted targets.


Settings

In the Settings panel, managers can assign a Plant Operator and Job Foreman, which will display their names and contact on the job summary. The Schedule Contact name and phone will be included on the Schedule PDF. Click Show All Users to expand the user lists to include more user roles.

To save the schedule job, click ‘Save Job’ at the bottom of the page.

Updated on June 20, 2023

What are your Feelings

  • Happy
  • Normal
  • Sad

Share This Article :

  • Facebook
  • X
  • LinkedIn
  • Pinterest
Job AccessTruck Dispatch
Table of Contents
  • Overview
  • Schedule a Job
  • Job Details
  • More Details
  • Job Schedule
  • Load Location
  • Deliver Location
  • Target
  • Settings

Subscribe to our Newsletter

Get notified of news and updates first.

    Porto App Landing © Copyright 2023. All Rights Reserved.